1 → Pre-FEED
|
- Scope Definition
- Deliverables:
- Operating & Maintenance Philosophy
- Preliminary DBM (Design Basis Memorandum)
- Preliminary Cost Estimate
- Preliminary Project Schedule
- Preliminary Long Lead Equipment Delivery
- Preliminary Construction Forecast
|
2 → FEED (Front End Engineering Design)
|
- Input from Pre-FEED
- Preliminary Engineering
- Deliverables:
- Engineering
- Philosophies
- Procurement
- Estimation
- Scheduling
|
3 → EDS (Engineering Design Stage)
|
- Input from FEED
- Deliverables:
- Project & Mechanical
- Process
- Instrumentation & Control
- Electrical
- Civil & Structural
- Procurement
- Estimation
- Scheduling
- Hazard Analysis
|
4 → DE (Detailed Engineering)
|
- Input from EDS
- Detailed Design Documents
- Deliverables:
- Mechanical & Process
- Electrical
- Instrumentation & Control
- Civil & Structural
- Estimation
- Procurement
- Scheduling
|
5 → Construction
|
- Input from DE
- Deliverables:
- Engineering
- Estimation
- Procurement
- Scheduling
|
6 → Pre-Commissioning
|
- Input From Construction
- Deliverables:
- Engineering
- Estimation
- Procurement
- Scheduling
|
7 → Start Up
|
- Input from Pre-Commissioning
- Deliverables:
- Engineering
- Estimation
- Scheduling
|
8 → Project Close Out
|
- Input from DE, Construction, Pre-Commissioning & Start Up
- Deliverables:
- Project Close Out Documents
|